Kia Sportage: High tension steel sheet used area
READ NEXT:
Radiator support panel complete
Fender apron panel
Fender apron panel assembly
Front side outer member assembly
Cowl & Dash panel
Cowl panel complete
Cowl side outer pan
Front seat cross rear member assembly
Center floor panel
Side sill inner panel assembly
Center floor side outer member assembly
Center floor side inner member assembly
Propeller shaft m
Roof front rail assembly
Roof rear rail assembly
Roof panel
Roof center No.1 rail
Roof center No.2 rail
Roof center No.3 rail
Roof panel (With sunroof)
Roof front rail assembly
SEE MORE:
Preparation for assembly
1. Spot weld finish
Use a disk grinder or similar tool to finish spot weld
mark. Do not grind more than is necessary to smooth
surface.
2. Panel preparation
Repair any bent or uneven areas with a hammer to
improve the assembly process.
3. Cutting a rough area for
Checking the washer fluid level
The reservoir is translucent so that you
can check the level with a quick visual
inspection.
Check the fluid level in the washer
fluid reservoir and add fluid if necessary.
Plain water may be used if
washer fluid is not available.
However, use was