SportageMotor

Kia Sportage: Notes when welding body

Kia Sportage - Second generation (JEKM) (2005-2015) - Body Workshop Manual / Replacing body panels / Notes when welding body

READ NEXT:

 Disassembling spot welded area

Most body parts are spot welded. In order to disassemble the damaged area, it is best to disassemble the spot welded area from the body frame using a spot cutter or candle type edge drill bit. Do

 Spot welding

1. Commercial spot welding machines do not perform as well as the machines used in the manufacturing process. When spot welding, increase the number of spot welds by 30% (1.3 times the original num

 Disassembly - Replacing body panel

Disassembly 1. Body measurement Before disassembling, measure the damaged area according to the dimensions supplied in Body Dimension, Section 31. If deformation is present, use a frame str

SEE MORE:

 CVVT Oil Control Valve (OCV)

Description and Operation  Description Continuous Variable Valve Timing (CWT) system advances or retards the valve timing of the intake and exhaust valve in accordance with the ECM control signal which is calculated by the engine speed and load. By controlling CVVT, the valve over-lap

 Changing tires

WARNING A vehicle can slip or roll off of a jack causing serious injury or death to you or those nearby. Take the following safety precautions: Never place any portion of your body under a vehicle that is supported by a jack. NEVER attempt to change a tire in the lane of traffic. ALW

Content